We have successfully executed both maintenance and capital projects for a large roster of customers in the oil & gas, pulp & paper, mining & smelting, power generation, and chemical industries.

EPC Companies
  • Kiewit
  • SNC Lavalin
  • AMEC
  • FLUOR
  • Saipem Canada Inc
  • PCL
Oil and Gas
  • Syncrude
  • Chevron Canada
  • CNRL
  • Husky Oil
  • Shell Oil
  • Enbridge
  • Suncor
  • Imperial Oil
  • Marathon Oil
  • Irving Oil
  • Union Gas
  • BP Canada Petroleum
Chemical
  • Nova Chemical
  • Erco Worldwide
  • Canexus
  • Dow Chemical Canada Inc
  • 3M Canada
  • Air Products
  • Dupont Canada Inc
  • Ethyl Canada
  • Fiberglass Canada
  • ICI Canada Inc
  • Praxair Products Ltd
  • Liquid Carbonic
  • Monsanto Canada
  • Terra International (Canada) Inc
  • Bayer Inc
  • Cabot Canada Ltd.
  • Orica & LINDE
Pulp and Paper
  • ALPAC
  • Canfor
  • Catalyst
  • Celgar
  • DMI
  • Domtar
  • Paper Excellence
  • Canadian Kraft Paper Industries Limited
  • West Fraser
Mining and Smelting
  • Agrium
  • PotashCorp
  • Mosaic
  • Rio Tinto
  • Teck Metals
  • Areva
  • Cameco
Power Generation
  • Andritz Hydro Canada
  • Saskpower
  • Atco Power Canada
  • Covanta Energy
  • Voith Hydro
  • Whitecourt Power
  • Capital Power

As is often the case, we had to contact your group to prepare and mobilize within a very limited timeframe. The efforts that were put in over the weekend leading up to the shutdown by you and your staff were greatly appreciated and well worth it. I have toured the site myself several times and have even done a few trips with our Teck Safety Rep. Each and every time I found it hard to identify any deficiencies.

Teck Metals #2 Slag Furnace Emergency

It was exceptional to see CIMS come to site and take over a project that was partially completed by another contractor and finish the project without having to move the original schedule. CIMS was a pleasure to work with as they were very self-sufficient and executed the scope of work in a high quality and safe manner.

Suncor Firebag Projects

In my mind, the key enabling factors for the project’s success were high-quality project supervision, good communication, and perhaps most importantly, the significant collaborative effort.

Canfor Pulp Limited Partnership

Kudos to the management and craft as your collaboration on the safety culture is reflected by the data as well with the attitude that was observed on the job site. Be safe and it was a pleasure to work with each one of you.

Suncor Major Projects Firebag
Next: Projects